Soil Erosion Permits

Bingham Township

Gene Allen – (Self) Excavation to remove trees along driveway at 4828 S. Center Highway ($80).

Mark Anderson – (Maple Hill Builders LLC) Excavation for home addition 20’x40’ at 2830 S. Pine Meadow Path ($125).

Elmwood Township

David Clark – (Peninsula Pavers) Maintenance and repair of existing sea wall, filter fabric top row and resituate the rip rap that has pulled away at 8030 S. Lakeview Road ($90).

Empire Township

Gary Becker – (John Klingman) Excavation slab for 1400 st +/- clubhouse building at 6760 W. Empire Highway ($300).

Glen Arbor Township

Robert Bloom – (Crystal River Corp) Excavation to dig up and replace existing plugged drain field at 6971 SW Manitou Trail ($125).

Leelanau Township

Michael McMillan – (Paul Maurer General Contracting) Phase 1: Excavate to remove trees and driveway and excavate for new home pad area. Phase II: Excavation for the new home at 8053 N. Gills Pier Road ($125).