Go to main contentsGo to search barGo to main menu
Monday, June 2, 2025 at 9:45 PM
martinson

Soil-erosion permits

Bingham Township

Scott and Jessica Oomen (Foundation Systems of Michigan LLC) Residential alteration – Install 20ft band board-sister/blocking, 215 ft rim joist insulation and basement waterproofing trench at 4067 S. West Bayshore Drive ($26,614.44).

AT&T Mobility LLC (MASTEC) Commercial alteration to cell tower – Remove 3 antennas and 9 radio heads. Remove 3 tower mounted amplifiers. Replace baseband cabinet, power cabinet and coverter related equipment at 10901 E. Revold Road ($20,000).

PLEASE LOG IN FOR PREMIUM CONTENT. Our website requires visitors to log in to view the best local news. Not yet a subscriber? Subscribe today!
ventureproperties
Support
e-Edition
Leelanau Enterprise
silversource
enterprise printing